This progressive design-build project included the design and installation of theater lighting upgrades at four Tacoma Public Schools high schools: Mount Tahoma, Silas, Lincoln, and Stadium. The project modernized each theater’s performance and house lighting systems with new LED fixtures, upgraded dimmer rack controls, and included minor electrical and finish improvements. Awarded in late December 2024, the team completed design and material procurement within an accelerated timeline to begin construction in June 2025 during the school’s summer breaks. Through a collaborative design-build approach, the team delivered efficient, standardized solutions tailored to each campus while maintaining strict schedule requirements.