This design-build project consisted of replacing aging 6’’ AC water lines with 6,800 LF of ductile iron pipe for a new water system. This project also replaced gas mains for 284 dwelling units in Saratoga Heights, approximately 8,400 LF of 4’’ and 2’’ PE pipe. Short runs of new service lines were installed between the new gas main and existing service lines. WA Patriot performed this project in a large family housing development with very little impact to residents.