This design-build project involved the relocation and consolidation of maintenance, shop and administrative facilities from Bremerton to Silverdale. The scope of work includes construction of a new facility to house the three relocated facility operations. Construction utilizes concrete tilt-up, structural steel, and metal roofing.
This project is an Associated General Contractors of WA (AGC) 2016 “Build Washington” award winner for Construction Excellence.