Delivered using a progressive design-build approach, the Bus Barn Replacement project involved the design and construction of a 4,850 square foot pre-engineered metal building to support the district’s transportation operations. The facility includes two large service bays for bus maintenance and shop work, along with dedicated office space and a storage mezzanine.
WA Patriot was selected for this budget-challenged project based on our commitment to collaborative planning and transparent cost management. Working closely with the QSD team, we developed a practical design solution that aligned with the district’s budget while fulfilling their promise to the community that funded the project. The progressive design-build process allowed the team to refine scope and costs together, ensuring the final facility met both operational needs and financial constraints.
