Project: Modernize Non-Destructive Testing Lab

WA Patriot installed approximately 600,000 lbs of lead sheeting on walls and ceilings of existing Permanent Radiography Installation (PRI) vaults; provided PRI safety interlocks and surveying cameras; installed air conditioning; performed stairway repairs at an existing testing laboratory in Bremerton, WA. The project was completed ahead of schedule with outstanding results.