The 7 Seas Waterfront Taproom is a 6,000 SF wood-framed, two-story new building located on Gig Harbor’s waterfront. The project involved demolition of an existing structure that served as the interim 7 Seas location until the new structure was built. The main level houses the taproom and the lower level includes offices, storage, and space for future onsite brewing.
This project earned our team a 2024 AGC of Washington “Build Washington” award for Construction Excellence.
