Madigan North-5 Psychiatric Patient Unit Renovation

This design-build project involved the repair and renovation of a 14,000 square foot psychiatric patient care unit. Scope included patient care room renovations, improved safety of staff work areas, floor and ceiling refreshes and the addition of behavioral health specific finishes and hardware throughout the floor. Work also included improvements to the nurse call, fire alarm, access control and security systems within the patient care area, which greatly improved the overall standard of care in the unit as well as staff and patient safety.

This project earned a 2022 AGC of WA “Build Washington” award for Construction Excellence.

Medical Clinic Interior Remodel, Fire Alarm System and Elevator Upgrades

B940

This project renovated an existing medical clinic in Bremerton, WA. The scope of work included replacing worn out systems and components, and reconfiguring spaces on the 1st, 2nd, and 3rd floors as well as portions of the exterior. WA Patriot developed and effectively implemented infection control procedures throughout the entire project. The facility remained occupied and fully operational during construction.

Hospital Life Safety Repairs

Life Safety

This project addressed various life safety issues and general maintenance items throughout an entire hospital in Bremerton, WA. General scope included replacing ceiling tile and grid, fire stopping of existing penetrations in the ceiling space, changing out light ballasts and lamps, replacing fire sprinkler heads, installing new fire dampers, tagging out valves, and replacing misc. doors and hardware.

WA Patriot developed and effectively implemented infection control procedures throughout the entire project. The facility remained occupied and fully operational during construction.

Modernize Hospital Security Operations

Security Ops

This project involved renovations at a fully operational hospital to the existing security operations center, replacing the existing CCTV and card reader head end equipment, and adding new card readers at existing doors throughout the hospital. WA Patriot conducted the renovation work in two phases.

WA Patriot developed and effectively implemented infection control procedures throughout the entire project. The facility remained occupied and fully operational during construction.