Medical Clinic Interior Remodel, Fire Alarm System and Elevator Upgrades

B940

This project renovated an existing medical clinic in Bremerton, WA. The scope of work included replacing worn out systems and components, and reconfiguring spaces on the 1st, 2nd, and 3rd floors as well as portions of the exterior. WA Patriot developed and effectively implemented infection control procedures throughout the entire project. The facility remained occupied and fully operational during construction.

Hospital Life Safety Repairs

Life Safety

This project addressed various life safety issues and general maintenance items throughout an entire hospital in Bremerton, WA. General scope included replacing ceiling tile and grid, fire stopping of existing penetrations in the ceiling space, changing out light ballasts and lamps, replacing fire sprinkler heads, installing new fire dampers, tagging out valves, and replacing misc. doors and hardware.

WA Patriot developed and effectively implemented infection control procedures throughout the entire project. The facility remained occupied and fully operational during construction.

Modernize Hospital Security Operations

Security Ops

This project involved renovations at a fully operational hospital to the existing security operations center, replacing the existing CCTV and card reader head end equipment, and adding new card readers at existing doors throughout the hospital. WA Patriot conducted the renovation work in two phases.

WA Patriot developed and effectively implemented infection control procedures throughout the entire project. The facility remained occupied and fully operational during construction.

Modernize Non-Destructive Testing Lab

WA Patriot installed approximately 600,000 lbs of lead sheeting on walls and ceilings of existing Permanent Radiography Installation (PRI) vaults; provided PRI safety interlocks and surveying cameras; installed air conditioning; performed stairway repairs at an existing testing laboratory in Bremerton, WA. The project was completed ahead of schedule with outstanding results.

Admin Facility Seismic & Fire Alarm Upgrades

WA Patriot completed seismic, fire alarm, and interior upgrades to a 150,000 sq. ft. five-story concrete and steel building that houses approximately 1,000 workers. The building remained occupied and operations remained ongoing during construction activities.

Repair/Renewal, Marine Corps Reserve Centers,

WA Patriot performed the work of this design-build project simultaneously across various locations at Joint Base Lewis-McChord (JBLM) and Yakima Training Center. Work at JBLM included construction of a new dog kennel, upgrade aircraft hangar CCTV, installation of pre-engineered metal building pavilion and motor pool cover, testing and remediation of water penetration issues, and upgrade of building HVAC system. Yakima work included Anti-Terrorism Force Protection upgrades at perimeter fencing, reroofing, HVAC repairs, and added CCTV cameras and new lighting.

Replace Gas & Water Mains, Saratoga Heights

This design-build project consisted of replacing aging 6’’ AC water lines with 6,800 LF of ductile iron pipe for a new water system. This project also replaced gas mains for 284 dwelling units in Saratoga Heights, approximately 8,400 LF of 4’’ and 2’’ PE pipe. Short runs of new service lines were installed between the new gas main and existing service lines. WA Patriot performed this project in a large family housing development with very little impact to residents.

Remodel/Convert 3-Story Admin Facility

WA Patriot performed interior demolition, abatement, and extensive remodel of a 24,000 sf historical building to convert its previous use into a 3-story building that houses classrooms and administrative spaces. The remodel consisted of structural upgrades, new electrical and mechanical systems, and new finishes throughout. The scope of work also included the complete demolition of an adjacent building to provide parking for the newly renovated building.